Friday, 25 February 2011
A day as a builders labourer...
Sue & I had 2 days off work, yesterday and today. Yesterday we drove around Cheshire looking at stables and stable manufactuers and today I went down to site and helped in moving a 16 tonne pile of gravel ! The garage is now ready for sand, membrane, metal, a building control inspection and then concrete, the driveway is now fairly level all to the end and is at the correct height in relation to the garage (we will put the pretty gravel down when all building work is finished. Had an amazing team of workers there today and between 4 of us the 16 tonnes is all in the relavent place and has been wacked down, amazing day and we both think its looking like a garage now a huge one at that the garage is 6.4 x 6.11 and the rear store is 6.4 x 2.845 so i'd hope we wouldnt be short of space..... !! Yeah cant wait to use it.
Friday, 18 February 2011
Walls to damp height exterior
Exterior below damp course finished, interior concrete block below damp course half done and nearing pouring the floor next week which will be level with the highest red brick that you can see.
Monday, 14 February 2011
Bricks to the damp course level
So 4 lots of concrete commons, 2 lots of cheap red bricks, this is upto damp course level. When complete all around the garage outer and inner cavity the hardcore will be spread, ground prepped for concrete, then building inspector will come and check it and we can get the concrete floor in upto the brick height that you can see. From there up the garage will be built of the normal finishing bricks and inner blocks above the damp course.
Sunday, 13 February 2011
Pics as promised
So here we have another delivery...... the rear wall backing onto the field....... and the front right corner and Im told it needs this many spirit levels if your doing the job properly... I cant argue with that answer really and have witnessed every single brick does get checked to make sure its 100% level so we should get a good build. Top marks to Andy the builder for his attention to details from us !
Saturday, 12 February 2011
A huge busy week
Well I dont suppose it was a huge week, its still the normal & days but a busy 7. Footings DONE ! Garage door lintle details with strutural engineer DONE ! Garage door confirmation that it will fit DONE ! Some bricks down YEP we have 3 sides with 4 courses of bricks.... today we have been to get fence posts and rails with the new trailer and Sue & I have put up a boundary fence between us and our neighbours land, been crazy busy getting everything together this week in the hope that things will go slightly smoother in the coming weeks, we shall see & pics coming soon tomorrow I hope. Over & out for now.
Saturday, 5 February 2011
Concrete delivery...
Subscribe to:
Comments (Atom)